Deposit for Mural at 125 S Highway

$1,500

This covers the first 50% of the cost of the mural to be created at 

125 S Highway in Solana Beach. This cost does not include the cost of the lift required to complete the design. 

This mural will be scheduled to begin as soon as this order has been processed. Estimated Schedule: 4 Days.

Please note- the images on this page are simply candidate mockups. The preferred design may not be shown.